Candidate for inert special structures
The new brief identifies geotextiles as a major application. UHMWPE chemical inertness and dielectric properties make it a candidate, but the fabric and its properties have not yet been selected.
A durable inert layer in soil
Geotextile is a new major direction: separation and reinforcement layers in roadbeds, drainage structures and special dielectric liners. The exact fibre and fabric grade must be selected for each project.

01 — ROLE IN THE PRODUCT
The material is selected by its function in the structure. The same product may require different fibres depending on the environment and load.
The new brief identifies geotextiles as a major application. UHMWPE chemical inertness and dielectric properties make it a candidate, but the fabric and its properties have not yet been selected.
02 — APPLICATIONS
Layer separation, load distribution and protection against mixing of materials.
Improved layer stability with appropriate calculations and tests on the finished fabric.
Filtering and separating solutions with the required water permeability.
Dielectric and insulating constructions after confirmation of material parameters.
03 — VISUAL GUIDE
The illustrations show where the high-performance material sits and what it does. These are application diagrams, not photographs of serial products.
Diagram 01
Diagram 02
Diagram 03 04 — CATALOGUE GUIDE
A starting point for a technical inquiry, not a ready-made pilot specification.
05 — SELECTION AND PILOT
The more precise the inputs, the fewer unnecessary samples and the faster the comparison with the incumbent material.
Record the answer in the technical specification together with the control material, pilot volume, test method and acceptance criteria.
Record the answer in the technical specification together with the control material, pilot volume, test method and acceptance criteria.
Record the answer in the technical specification together with the control material, pilot volume, test method and acceptance criteria.
Record the answer in the technical specification together with the control material, pilot volume, test method and acceptance criteria.
Next step
Open the inquiry form and specify the product, requirements and approximate pilot volume. Lab-test samples are free.